EV charging support for high rise apartments

3kw should be good enough. No need to get it upgraded.

2 Likes

Additionally, you can see the load being used on the bill. I just casually enquired with the guy reading the meter as to how much it would cost to get another sub-meter and he said Iā€™m not using the full load anyway, why pay 20k to get another meter.

1 Like