Answers in line:
Will there be a Ather 560 or Ather 670 with larger battery?
Not in the near future.
Will there be a super-bike version with larger battery and bigger wheels?
Not in the near future
Will there be a larger scale production of Ather 450 in Bangalore?
We are looking at ramping up production. Not sure if it will happen in Bengaluru or some other city. The current plant can ramp up to 30k vehicles per year. Once the production goes above it, we will need a plant with a larger capacity.
Is there a plan for solar based chargers like Tesla in Bangalore/outside Bangalore?
While solar charging is a great way to reduce carbon impact, currently though, all the public charging points utilize existing grid infrastructure, and tapping the electricity from the Ather Grid hostās. Also, generating distributed solar energy isnāt the most efficient way currently.